A project has been implemented for one of the most innovative companies in the world, a developer of an online service based on artificial intelligence to help write texts in English
We were tasked with the shortest possible time
The task was in the shortest time to develop project documentation for a finished design project for the office of the company. It was necessary to take into account the engineering parameters and features of the business center. The most attention was paid to ventilation systems, air conditioning and lighting. Because of the floor windows and the outer glass walls of the work areas, the office always has a lot of daylight, and in the evening they imitate various types of lamps.
The result was a bright, simple, non-formal and very functional office, where employees can feel as a large family, united by the bonds of common ideas and tasks.
Object area– 1,600 m²
The list of work performed:
- General Contract;
- projection (all parts);
- installation of HVAC;
- installation of electricity equipment;
- installation of SCS;
- fit out works;
- installation of aluminum and glass partitions;
- installation of the fire prevention system